beijing people’s electric plant co., ltd.-2024欧洲杯买球软件
department of reliability is introduced
in order to ensure product quality, improve product reliability, our company set up the reliability department, and invested a lot of manpower, the physical reliability test center is established. the reliability test center has a laboratory, a director of several laboratory. in laboratory management, with reference to iso/ts 16949 automobile industry management program for laboratory test personnel and test equipment to carry on the standardized management, and established the enterprise according to iso/ts 16949 standard reliability test center management procedure, to ensure that test items, test facilities, effective management of laboratory business scope accurately and quickly and effectively to understand the intrinsic properties of products, components and raw materials process requirements, to verify that the products, components or raw materials are full
the serial number
|
test equipment
|
test categories
|
1 |
dc lab
|
1) dc selective fit test product hierarchy,
|
2 |
single-phase ac lab |
(1) communication products temperature rise test;
|
3 |
high and low temperature test chamber
|
the environmental testing of all kinds of involving the temperature;
|
4 |
pressure test equipment
|
1) power frequency withstand voltage test.
|
5 |
product demonstration cabinet
|
(1) is mainly used for customer visit.
|
dc250v 4000ah/dc1000v 1000ah直流试验室
high and low temperature environment test chamber